inscription
Portail d'information géographique

Résultats de la recherche (1 résultat)

Affinez votre recherche

Par Collection Par Auteur Par Date Par Sujet Par Titre
  • Flow-separation berms downstream of a hydraulic jump in a bedrock channel
  • The purpose of this paper is to report the first direct observation of the phenomenon of gravel berm formation, downstream of a hydraulic jump. As the observations were fortuitous, detailed measurements of hydraulic conditions were not possible
  • but estimates were obtained. These observations are compared with laboratory experiments and theory. The deposits have significance in constraining flood palaeoflow reconstructions as the presence of berms determines the former location of hydraulic jumps.
  • 1995